Locations · every region of New ZealandSEE THE DESIGNS
ARCHITECTURAL PLANS · NEW ZEALAND WIDE

Every region of New Zealand.

Seventy supplies architectural plans for properties across New Zealand. Ground conditions, wind, natural hazards and service connections affect the requirements at each address. Use the regional guides below to help plan your project, then appoint your own licensed builder for construction.

16
Regional guidesGround conditions, hazards and rental information.
67
Councils coveredPlanning guidance for every local council.
21
Town guidesEach with its rents, ground and council notes.
$4,900
Plan set fromNZD incl. GST, adapted to your address and signed.
01National requirements

Building consent and resource consent requirements

The national rules apply across New Zealand. Eligibility and local property requirements must still be checked.

01
The building consent exemption
Instrument

Schedule 1A, under the Building Act 2004

What it removes

Building consent, if all Schedule 1A conditions are met

How it works

A new, detached, single-storey home up to 70 m² may be built without a building consent if every exemption condition is met. Licensed professionals, Building Code compliance, a Project Information Memorandum and council notifications are still required.

02
The national planning standard
Instrument

NES-DMRU, under the Resource Management Act 1991

What it removes

Resource consent, if all relevant requirements are met

How it works

The national planning standard can permit one detached minor dwelling without resource consent when its standards and other relevant requirements are met. Some district and regional rules remain, including those for hazards, infrastructure and earthworks.

Both took effect on 15 January 2026. They do not retrospectively approve existing dwellings.

02National standards

National planning standards

The NES-DMRU sets national measurements for qualifying detached minor dwellings. Other relevant property restrictions still apply.

StandardResidential zoneRural zone
Maximum internal floor areaMeasured to the internal face of the external walls. An attached or internally accessed garage counts inside it.70 m²70 m²
Maximum area of the site covered by buildingsThe 50% standard overrides any district plan coverage standard below 50% in a residential zone.50%As required by the zone
Minimum distance from the main homeDistances are measured from the outside face of the wall cladding.2 m2 m
Minimum distance from the front boundary2 m10 m
Minimum distance from side and rear boundaries2 m5 m

The permitted activity rule: One detached minor residential unit per site. It applies in residential, rural, mixed use and Māori purpose zones, as defined in the National Planning Standards, or the equivalent zones where a council has not implemented them yet.

03What differs

Requirements that depend on your property

Review these matters with your designer and council. Maps, property records and site investigations may be needed.

01
Natural hazards
Check council maps

Flooding, coastal hazards, fault lines and land stability can affect the building location, floor level and need for consent. Check the council information and obtain site advice where needed.

02
Water, wastewater and stormwater
Check the property requirements

Check connection requirements and capacity. Relevant regional plan rules still apply, including requirements for an on-site wastewater system.

03
Electricity lines and infrastructure
Check council maps

Buildings near electricity lines and other significant infrastructure must meet the relevant safe-distance and planning requirements.

04
Nearby activities and contaminated land
Check council maps

Rules can apply near airports, ports, industry and farming operations, or on contaminated land. They may affect where a home can be built and what design measures are needed.

05
Earthworks and subdivision
Check the property requirements

Earthworks may need resource consent even when the dwelling does not. Subdivision requirements are separate and remain in place.

06
Heritage and cultural sites
Check council maps

Relevant protections for heritage, cultural sites and outstanding natural features still apply.

07
Title restrictions and bylaws
Check your property title

Check covenants and easements on your property title. The national planning standard does not override private covenants, and more stringent council bylaws can still apply.

08
Council contributions
Check the property requirements

Development and financial contributions may be payable. Ask your council to confirm which charges apply to your project.

04The regions
05Town guides

Guides for 21 towns and cities

Each guide covers local rent estimates, ground conditions and indicative construction times. Plan sets start at $4,900. You appoint your own licensed builder.

06Cost estimates

Indicative plan and construction costs

Construction estimates start around $133,000 for a Fern 48 on a simple site. Our calculator uses $2,950 to $4,350 per square metre, depending on finishes, with allowances for site conditions. Actual prices vary by property, region and builder.

DesignPlan setIndicative build from
Fern 48, 2 bed48 m² · about 9 weeks on site$4,900$133,000
Kōwhai 60, 2 bed60 m² · about 11 weeks on site$5,900$166,000
Rātā 70, 3 bed70 m² · about 13 weeks on site$6,900$194,000
07Project steps

Steps to plan your project

Start with the property title, planning requirements and service connections.

01
Review the property title
What happens

Check covenants and easements that could restrict a second home, its size, location or access.

02
Check planning requirements
What happens

Review council maps and relevant district and regional rules for natural hazards, infrastructure and other restrictions.

03
Confirm service connections
What happens

Identify the water, wastewater and stormwater connections and confirm capacity. Check any requirements for an on-site wastewater system.

04
Obtain a PIM
What happens

Apply for and receive a Project Information Memorandum before construction starts. It records the council information relevant to the property and proposed work.

05
Finalise the plans
What happens

Your designer confirms the design requirements for the property and prepares the required plans and documentation. The Schedule 1A exemption requires appropriately licensed professionals.

06
Complete the building notifications
What happens

Notify the council before construction and provide the required completion documents afterwards. Your designer and builder must supply the records and certificates required for their work.

08Questions

Frequently asked questions

Do I need building consent for a granny flat?+

A new, detached, single-storey dwelling up to 70 m² may qualify for the Schedule 1A exemption if every condition is met. The Building Code, licensed-professional requirements and council documentation still apply. Obtain a Project Information Memorandum before starting and provide the required notifications and completion records.

Will I need resource consent?+

The NES-DMRU can allow a qualifying detached minor dwelling without resource consent. The project must meet its standards and relevant district and regional requirements. Rules for matters such as hazards, earthworks and infrastructure may still require consent.

What floor area and setbacks are allowed?+

The national planning standards allow up to 70 m² internal floor area. In residential zones, the standards include 50% maximum building coverage and 2 m setbacks from the principal home and boundaries. Rural boundary setbacks are 10 m at the front and 5 m at the sides and rear, with coverage set by the zone. Check the table above and any other site restrictions.

Can district plans set different measurements?+

District plans can provide more generous measurements than the NES-DMRU. Equivalent district-plan measurements that are more restrictive do not apply to a qualifying proposal. Other relevant requirements, including natural-hazard and infrastructure restrictions, can still apply.

What local requirements still apply?+

Check natural hazards, service connections, infrastructure, nearby activities, contaminated land, earthworks, subdivision and heritage or cultural protections. Relevant regional plan rules also apply. Your council can confirm the requirements for your property and intended use.

Can a property title restrict the project?+

Yes. Covenants and easements can restrict building even where planning rules allow it. Obtain the title documents and get advice on any restriction that may affect the proposal. Relevant council bylaws also need to be checked.

Can I use the planning standard on vacant land?+

The NES-DMRU is for a minor dwelling associated with a principal home on the same site. A small home built first on vacant land is assessed as the principal home under the relevant district plan. This planning requirement is separate from eligibility for the building consent exemption.

Can the home be rented out?+

Residential rental use can be allowed, subject to the relevant requirements. Healthy Homes Standards and tenancy obligations apply where relevant. Small-scale short stays may qualify where secondary to residential use; confirm the proposed use with your council.

09Sources

Official guidance

The links below explain the national rules and exemption conditions.

Checked against these sources in September 2026. Confirm the current requirements for your property before construction.

Find a design for your property.

Architect-signed plan sets, customised for properties across New Zealand.

SEE THE DESIGNS
CALL USSEE THE DESIGNS