CALCULATOR · BUILD COST · UPDATED AUGUST 2026

Estimate the cost of building a small home

This calculator uses indicative rates of $2,950 to $4,350 per square metre depending on finish level, with site allowances of up to 18%. For example, a 48 m² build is estimated from $133,000, a 60 m² around $166,000, and a 70 m² home from $194,000. These are estimates, not construction quotes. The plan set itself is $4,900 to $6,900, adapted to your address, and any licensed builder can price from it.

$2,950/m²
ESSENTIALS SPEC
$3,550/m²
CLASSIC SPEC
$4,350/m²
PREMIUM SPEC
9–13 wks
ON SITE
THE CALCULATOR

Estimate your building cost.

Choose a floor area, finish level and site type to estimate building costs. Your chosen builder provides the construction quote.

FLOOR AREA60 m²
30 M²40506070 M²
FINISH
YOUR SITE
ESTIMATED BUILD COST
$200,000
to $230,000
FINISH RATE$3,550 / M²
TIME ON SITE11–13 wks
PLAN SETINCLUDED
Discuss your project

This is an estimate for budgeting. Your builder provides the construction quote. Includes design, delivery and foundations; excludes land.

01

What affects construction cost

Floor area, finish level and site conditions affect the estimated construction cost.

FINISH LEVELRATE PER M²INCLUDED FINISHES
Essentials$2,950Standard cladding, windows and doors.
Classic$3,550Timber details and upgraded bathroom and kitchen finishes.
Premium$4,350Cedar cladding, tiled finishes and full-height glazing.
SITE TYPEFACTORWHAT IT MEANS
Simple×1.00Level section, clear access, services within easy reach.
Sloped+9%Extra foundation and retaining work on a gentle fall.
Difficult+18%Steep ground, limited access or difficult soils may require extra work and engineering.

Estimated ranges are roughly −6% to +8% around the calculator midpoint. Your builder confirms the actual price and any additional site costs.

02

Estimates for each design

Compare the indicative construction cost for each design with Essentials, Classic and Premium finishes.

DESIGNESSENTIALSCLASSICPREMIUMWEEKS ON SITE
Fern 48 · 48 m²$133,000–$153,000$160,000–$184,000$196,000–$226,00010–12 wks
Kōwhai 60 · 60 m²$166,000–$191,000$200,000–$230,000$245,000–$282,00011–13 wks
Rātā 70 · 70 m²$194,000–$223,000$234,000–$268,000$286,000–$329,00012–14 wks

Indicative ranges for a simple site, including GST. The calculator adds about 9% for sloping sites and 18% for difficult sites. Construction is quoted by your builder. Plan sets: Fern 48 $4,900 · Kōwhai 60 $5,900 · Rātā 70 $6,900.

03

Compare ways to add living space

Compare a new small home, a consented minor dwelling, a sleepout and an existing property. Costs and approvals depend on the proposal.

OPTIONUP-FRONT COSTCONSENTTIMELINE
Seventy plan set + your builder · ≤70 m²$133,000–$194,000+ indicativeExemption may apply if all conditions are metPlans usually within 5 working days after release; builder confirms construction timing
Consented minor dwellingSimilar build cost, plus consent and processing feesFull building consent lodged and processedAllow time for council processing before construction
30 m² sleepoutCosts depend on size, specification and permitted useSeparate exemption conditions apply; confirm proposed useAsk the builder to confirm timing and facilities
Buying an existing unitLand plus dwelling at market pricen/aDepends on availability and settlement arrangements

The Schedule 1A exemption has design, construction and documentation conditions. Seventy provides plans; you appoint a licensed builder. Check relevant planning requirements for any option.

Confirm the consent requirements before agreeing a construction budget and schedule. Read the building consent exemption guide, and your council guide.

04

Build cost questions, answered

How are construction costs estimated?+

The calculator uses $2,950 per m² for Essentials, $3,550 for Classic and $4,350 for Premium. It applies allowances for the selected site category and displays a range around the result. These are modelling assumptions, not a builder’s quote.

What should I include in my budget?+

Allow for the plan set, construction, foundations, site preparation, service connections and any council fees or specialist reports. Ask your builder for a written list of inclusions, exclusions and allowances. Seventy sells the plans separately.

Do construction costs vary by region?+

Yes. Labour, freight, access, ground conditions and local requirements can affect the quote. The calculator uses the same base rates for all regions, so it does not replace a local builder’s estimate.

How does a sloping or difficult site affect the estimate?+

The calculator adds about 9% for sloping sites and 18% for difficult sites. Actual costs may differ. Your designer and builder need to confirm foundation, retaining, access and other site requirements.

Are the prices GST inclusive?+

The plan-set prices and calculator estimates are in New Zealand dollars and include GST. Check the GST treatment of each contractor’s quote when preparing your budget.

How long does construction take?+

The site uses indicative construction times of nine to thirteen weeks, depending on the design and site category. Your chosen builder confirms the actual schedule, including availability, site work and any approvals needed. Plan preparation happens before construction.

RELATED CALCULATORS AND GUIDES

Find a design for your budget.

Compare the sizes, layouts and fixed prices of our architect-signed plan sets.

SEE THE DESIGNS
CALL USSEE THE DESIGNS