Granny flats and small homes in Hawke's Bay.

Hawke’s Bay includes Napier City, Hastings District, Wairoa and Central Hawke’s Bay. A small home may provide family accommodation, a rental or housing for orchard staff. Current flood maps and the land categories introduced after Cyclone Gabrielle are important starting points. Seventy supplies plans adapted to your property; you arrange construction separately. Confirm the address-specific conditions, service connections and eligibility for both national consent exemptions.

4
Councils in the regionNapier, Hastings, Wairoa and Central Hawke's Bay.
1
Local area guideNapier and Hastings, local area guide.
$580
Indicative two-bedroom rentIndicative weekly estimate. Check current local rents.
Land categories
Post-GabrielleConfirm current conditions for the property before design.
Kōwhai 60 shown in a Hawke's Bay setting
KŌWHAI 60 SHOWN IN A HAWKE'S BAY SETTING. ILLUSTRATIVE.
01What the law now allows

Building consent and resource consent requirements

Both national reforms apply in Hawke's Bay. Building consent and resource consent are separate requirements. Your project must meet all the relevant conditions to proceed without either.

01
The building consent exemption
Instrument

Schedule 1A, under the Building Act 2004

What it removes

Building consent, if all Schedule 1A conditions are met

How it works

A new, detached, single-storey home up to 70 m² may be built without a building consent if every exemption condition is met. Licensed professionals, Building Code compliance, a Project Information Memorandum and council notifications are still required.

02
The national planning standard
Instrument

NES-DMRU, under the Resource Management Act 1991

What it removes

Resource consent, if all relevant requirements are met

How it works

The national planning standard can permit one detached minor dwelling without resource consent when its standards and other relevant requirements are met. Some district and regional rules remain, including those for hazards, infrastructure and earthworks.

Both took effect on 15 January 2026. They do not retrospectively approve existing dwellings.

02National standards

National planning standards

The NES-DMRU sets these measurements for qualifying detached minor dwellings in Hawke's Bay. District plans can allow more generous measurements. Other relevant site restrictions still apply.

StandardResidential zoneRural zone
Maximum internal floor areaMeasured to the internal face of the external walls. An attached or internally accessed garage counts inside it.70 m²70 m²
Maximum area of the site covered by buildingsThe 50% standard overrides any district plan coverage standard below 50% in a residential zone.50%As required by the zone
Minimum distance from the main homeDistances are measured from the outside face of the wall cladding.2 m2 m
Minimum distance from the front boundary2 m10 m
Minimum distance from side and rear boundaries2 m5 m

The permitted activity rule: One detached minor residential unit per site. It applies in residential, rural, mixed use and Māori purpose zones, as defined in the National Planning Standards, or the equivalent zones where a council has not implemented them yet.

District plan restrictions removed by the NES-DMRU
  • Special character, design guides and visual amenity
  • Screening for rubbish and recycling storage
  • Wall and roof colour, reflectivity and external finishes
  • Minimum outdoor open space, privacy or sunlight access
  • Minimum window area
  • Parking
  • Minimum site size
Examples of requirements removed by the NES-DMRU
  • A design that satisfies a local character guide
  • A minimum private outdoor space around the unit
  • A sunlight or privacy assessment for the neighbours
  • An on-site car park
  • A minimum site area under the district plan
  • Neighbour notification for a permitted activity
03Property requirements

Other requirements to check

Natural hazards, services, title restrictions and other site requirements can affect your project. Confirm which apply to your address.

01
Natural hazards
Check council maps

Flooding, coastal hazards, fault lines and land stability can affect the building location, floor level and need for consent. Check the council information and obtain site advice where needed.

02
Water, wastewater and stormwater
Check the property requirements

Check connection requirements and capacity. Relevant regional plan rules still apply, including requirements for an on-site wastewater system.

03
Electricity lines and infrastructure
Check council maps

Buildings near electricity lines and other significant infrastructure must meet the relevant safe-distance and planning requirements.

04
Nearby activities and contaminated land
Check council maps

Rules can apply near airports, ports, industry and farming operations, or on contaminated land. They may affect where a home can be built and what design measures are needed.

05
Earthworks and subdivision
Check the property requirements

Earthworks may need resource consent even when the dwelling does not. Subdivision requirements are separate and remain in place.

06
Heritage and cultural sites
Check council maps

Relevant protections for heritage, cultural sites and outstanding natural features still apply.

07
Title restrictions and bylaws
Check your property title

Check covenants and easements on your property title. The national planning standard does not override private covenants, and more stringent council bylaws can still apply.

08
Council contributions
Check the property requirements

Development and financial contributions may be payable. Ask your council to confirm which charges apply to your project.

Check both sets of requirements
Planning permission does not confirm building consent exemption

A district plan may allow a larger home or a smaller boundary setback. That does not change the separate Schedule 1A requirements. For example, an 80 m² dwelling or a 1 m setback would not meet the 70 m² and 2 m conditions for this building consent exemption.

04Does your site qualify

Check the main eligibility conditions

Check these conditions with your designer and council. They are a starting point; all relevant exemption requirements must be met.

01
Detached home
What it means

The minor dwelling must be physically separate from the principal home. An attached extension is assessed under different requirements.

02
Principal home on the same site
What it means

The NES-DMRU planning standard requires a minor dwelling to be secondary to a principal home on the same site and in the same ownership. If both are proposed together, confirm the construction order and requirements with the council.

03
One minor dwelling per site
What it means

The NES-DMRU allows one detached minor dwelling per site. For a cross-lease, the site includes all the land under the cross-lease. A district plan may allow more, subject to its requirements.

04
New dwelling for Schedule 1A
What it means

The building consent exemption applies to new dwellings. A building conversion may meet the planning standard, but it is not covered by this building consent exemption.

05Building in Hawke's Bay

Ground conditions and foundations

Gravel on parts of the Heretaunga Plains can provide different foundation conditions from reclaimed or softer coastal land. Hillside sites may require stability and retaining assessments. The foundation and floor level should follow current ground information, hazard mapping and any applicable land-category requirements.

The Heretaunga Plains include gravel soils, with softer or wetter ground toward river mouths and the coast. Napier hill sites add slope and exposure. Check the current land category and flood information, which may affect floor levels, building location or whether a new dwelling is appropriate.

9 to 12 weeks
Indicative construction timeIndicative only. Your builder confirms the construction schedule.
06Natural hazards and mapped restrictions

Site restrictions in Hawke's Bay

Council maps help identify potential restrictions. Your designer and council can confirm how they affect the building location, floor level or need for additional reports.

01
Land categories after Cyclone Gabrielle
What it does

Confirm the property’s current land category and any restrictions or conditions on a new dwelling.

02
Tukituki, Ngaruroro and Esk flooding
What it does

Check updated flood information for the Tukituki, Ngaruroro and Esk catchments.

03
Coastal inundation, Napier and the bay
What it does

Low-lying coastal land may have sea-flooding requirements that affect the proposal.

04
Liquefaction on reclaimed land
What it does

Reclaimed and soft ground around Napier and the plains may require liquefaction and foundation assessment.

07Local knowledge

Local requirements to check

Review these local considerations when planning a project in Hawke's Bay.

01
Napier and Hastings council requirements
Why it matters

Confirm whether Napier City or Hastings District administers the property. Each maintains its own hazard information and service requirements.

02
Property land category
Why it matters

Check the current land category before confirming the design location and project budget.

03
Orchard blocks and rural standards
Why it matters

For qualifying rural proposals, the national boundary setbacks are 10 m at the front and 5 m at the sides and rear. Wastewater and access still need checking.

04
Wastewater in Central Hawke's Bay and Wairoa
Why it matters

Outside serviced areas in Central Hawke’s Bay and Wairoa, confirm the wastewater treatment and disposal requirements.

08Uses for a small home

Uses for a small home in Hawke's Bay

Possible uses include accommodation for family, orchard workers and people employed in healthcare or port services. Owners of cyclone-affected properties may also be considering different housing arrangements. The relevant land category and hazard advice should be established before choosing a location for a new dwelling.

The Hawke’s Bay example uses about $580 a week for a two-bedroom home and construction from around $166,000 for a Kōwhai 60 on a simple site. Land-category conditions, flood requirements and service work can affect both cost and timing. Obtain a property-specific quote and verify the rental assumption.

09Project steps

Steps to plan your project

Review the title, planning requirements and services before construction. Your designer, builder and council can confirm what the project requires.

01
Review the property title
What happens

Check covenants and easements that could restrict a second home, its size, location or access.

02
Check planning requirements
What happens

Review council maps and relevant district and regional rules for natural hazards, infrastructure and other restrictions.

03
Confirm service connections
What happens

Identify the water, wastewater and stormwater connections and confirm capacity. Check any requirements for an on-site wastewater system.

04
Obtain a PIM
What happens

Apply for and receive a Project Information Memorandum before construction starts. It records the council information relevant to the property and proposed work.

05
Finalise the plans
What happens

Your designer confirms the design requirements for the property and prepares the required plans and documentation. The Schedule 1A exemption requires appropriately licensed professionals.

06
Complete the building notifications
What happens

Notify the council before construction and provide the required completion documents afterwards. Your designer and builder must supply the records and certificates required for their work.

10The councils

Hawke's Bay's 4 councils.

Find your council guide for local natural-hazard information, services, contributions and the Project Information Memorandum process.

11Locations

Plans anywhere in Hawke's Bay.

These towns each have their own page with the local rent, ground notes and indicative construction time. Plan sets include a licence for one build with your chosen licensed builder, from $4,900. Seventy supplies the plans; construction is arranged separately.

SEE THE DESIGNSESTIMATE BUILD COST
12Questions

Frequently asked questions

Does Seventy supply plans in Hawke's Bay?+

Seventy supplies architectural plans for properties in Hawke's Bay, including Napier, Hastings, Havelock North. The plans are adapted to your address and include a licence for one build. You appoint and pay your own licensed builder to quote for and carry out construction.

Will I need consent for a small home in Hawke's Bay?+

A home up to 70 m² may qualify for the building consent exemption if all Schedule 1A conditions are met. Resource consent is a separate question. In Hawke's Bay, check the national planning standards and relevant local requirements, including hazards, services and the property title.

What ground conditions should I check in Hawke's Bay?+

Gravel on parts of the Heretaunga Plains can provide different foundation conditions from reclaimed or softer coastal land. Hillside sites may require stability and retaining assessments. The foundation and floor level should follow current ground information, hazard mapping and any applicable land-category requirements.

Which local requirements need checking in Hawke's Bay?+

Confirm the property’s current land category and any restrictions or conditions on a new dwelling. Confirm whether Napier City or Hastings District administers the property. Each maintains its own hazard information and service requirements. Your designer and council can confirm the requirements for the specific address and proposed use. A general regional guide cannot establish whether an individual property is suitable for the design.

How should I budget for a small home in Hawke's Bay?+

The Hawke’s Bay example uses about $580 a week for a two-bedroom home and construction from around $166,000 for a Kōwhai 60 on a simple site. Land-category conditions, flood requirements and service work can affect both cost and timing. Obtain a property-specific quote and verify the rental assumption.

How long could construction take in Hawke's Bay?+

The regional construction allowance is 9 to 12 weeks. This is indicative and does not include every project stage. Your chosen builder confirms the start date and programme after reviewing the plans, site work, services, access and delivery requirements. Include time for any required council processes.

13Sources

Official guidance

The links below explain the national rules and exemption conditions. Confirm local requirements with your council.

Checked against these sources in September 2026. Confirm the current requirements for your property before construction.