Granny flats and small homes in Canterbury.

Canterbury includes nine councils, from Kaikōura and Hurunui through Christchurch and the plains to Mackenzie and Waimate. Small homes may provide family, rental or rural staff accommodation. Ground conditions, flood information, title covenants and wastewater capacity need checking. Seventy’s plans are drawn with Splice Design Ltd, whose main office is in Christchurch. You appoint a licensed builder, and national exemption conditions and relevant property requirements still apply.

9
Councils in the regionEach council has a planning guide.
4
Town guidesChristchurch, Rangiora, Ashburton and Timaru.
$520 to $620
Indicative two-bedroom rent, per weekIndicative weekly estimate. Check current local rents.
TC1 to TC3
Foundation technical categoriesCheck the technical category and required ground investigations.
Kōwhai 60 shown in a Canterbury setting
KŌWHAI 60 SHOWN IN A CANTERBURY SETTING. ILLUSTRATIVE.
01What the law now allows

Building consent and resource consent requirements

Both national reforms apply in Canterbury. Building consent and resource consent are separate requirements. Your project must meet all the relevant conditions to proceed without either.

01
The building consent exemption
Instrument

Schedule 1A, under the Building Act 2004

What it removes

Building consent, if all Schedule 1A conditions are met

How it works

A new, detached, single-storey home up to 70 m² may be built without a building consent if every exemption condition is met. Licensed professionals, Building Code compliance, a Project Information Memorandum and council notifications are still required.

02
The national planning standard
Instrument

NES-DMRU, under the Resource Management Act 1991

What it removes

Resource consent, if all relevant requirements are met

How it works

The national planning standard can permit one detached minor dwelling without resource consent when its standards and other relevant requirements are met. Some district and regional rules remain, including those for hazards, infrastructure and earthworks.

Both took effect on 15 January 2026. They do not retrospectively approve existing dwellings.

02National standards

National planning standards

The NES-DMRU sets these measurements for qualifying detached minor dwellings in Canterbury. District plans can allow more generous measurements. Other relevant site restrictions still apply.

StandardResidential zoneRural zone
Maximum internal floor areaMeasured to the internal face of the external walls. An attached or internally accessed garage counts inside it.70 m²70 m²
Maximum area of the site covered by buildingsThe 50% standard overrides any district plan coverage standard below 50% in a residential zone.50%As required by the zone
Minimum distance from the main homeDistances are measured from the outside face of the wall cladding.2 m2 m
Minimum distance from the front boundary2 m10 m
Minimum distance from side and rear boundaries2 m5 m

The permitted activity rule: One detached minor residential unit per site. It applies in residential, rural, mixed use and Māori purpose zones, as defined in the National Planning Standards, or the equivalent zones where a council has not implemented them yet.

District plan restrictions removed by the NES-DMRU
  • Special character, design guides and visual amenity
  • Screening for rubbish and recycling storage
  • Wall and roof colour, reflectivity and external finishes
  • Minimum outdoor open space, privacy or sunlight access
  • Minimum window area
  • Parking
  • Minimum site size
Examples of requirements removed by the NES-DMRU
  • A design that satisfies a local character guide
  • A minimum private outdoor space around the unit
  • A sunlight or privacy assessment for the neighbours
  • An on-site car park
  • A minimum site area under the district plan
  • Neighbour notification for a permitted activity
03Property requirements

Other requirements to check

Natural hazards, services, title restrictions and other site requirements can affect your project. Confirm which apply to your address.

01
Natural hazards
Check council maps

Flooding, coastal hazards, fault lines and land stability can affect the building location, floor level and need for consent. Check the council information and obtain site advice where needed.

02
Water, wastewater and stormwater
Check the property requirements

Check connection requirements and capacity. Relevant regional plan rules still apply, including requirements for an on-site wastewater system.

03
Electricity lines and infrastructure
Check council maps

Buildings near electricity lines and other significant infrastructure must meet the relevant safe-distance and planning requirements.

04
Nearby activities and contaminated land
Check council maps

Rules can apply near airports, ports, industry and farming operations, or on contaminated land. They may affect where a home can be built and what design measures are needed.

05
Earthworks and subdivision
Check the property requirements

Earthworks may need resource consent even when the dwelling does not. Subdivision requirements are separate and remain in place.

06
Heritage and cultural sites
Check council maps

Relevant protections for heritage, cultural sites and outstanding natural features still apply.

07
Title restrictions and bylaws
Check your property title

Check covenants and easements on your property title. The national planning standard does not override private covenants, and more stringent council bylaws can still apply.

08
Council contributions
Check the property requirements

Development and financial contributions may be payable. Ask your council to confirm which charges apply to your project.

Check both sets of requirements
Planning permission does not confirm building consent exemption

A district plan may allow a larger home or a smaller boundary setback. That does not change the separate Schedule 1A requirements. For example, an 80 m² dwelling or a 1 m setback would not meet the 70 m² and 2 m conditions for this building consent exemption.

04Does your site qualify

Check the main eligibility conditions

Check these conditions with your designer and council. They are a starting point; all relevant exemption requirements must be met.

01
Detached home
What it means

The minor dwelling must be physically separate from the principal home. An attached extension is assessed under different requirements.

02
Principal home on the same site
What it means

The NES-DMRU planning standard requires a minor dwelling to be secondary to a principal home on the same site and in the same ownership. If both are proposed together, confirm the construction order and requirements with the council.

03
One minor dwelling per site
What it means

The NES-DMRU allows one detached minor dwelling per site. For a cross-lease, the site includes all the land under the cross-lease. A district plan may allow more, subject to its requirements.

04
New dwelling for Schedule 1A
What it means

The building consent exemption applies to new dwellings. A building conversion may meet the planning standard, but it is not covered by this building consent exemption.

05Building in Canterbury

Ground conditions and foundations

Canterbury gravel sites can differ substantially from softer eastern Christchurch and estuary ground. Technical categories TC1, TC2 and TC3 help identify foundation considerations, but do not replace property-specific advice. TC3 generally requires detailed geotechnical assessment. Inland and foothill sites may also require snow and wind design.

Canterbury includes gravel plains, river and estuary soils, hills and inland areas subject to snow. Christchurch technical-category and liquefaction information can affect foundation requirements. Confirm the wind and snow loads for the address, along with flood levels, drainage and the ground investigation needed for the proposal.

9 to 12 weeks
Indicative construction timeIndicative only. Your builder confirms the construction schedule.
06Natural hazards and mapped restrictions

Site restrictions in Canterbury

Council maps help identify potential restrictions. Your designer and council can confirm how they affect the building location, floor level or need for additional reports.

01
Technical category, eastern Christchurch
What it does

Check the technical category and any ground-investigation requirements for the property.

02
Plains river flooding
What it does

Review flood information for the Waimakariri, Ashburton, Rangitata and Ōpihi catchments.

03
Liquefaction
What it does

Check liquefaction information alongside the ground report, particularly in eastern Christchurch and around the estuary.

04
Inland snow loads
What it does

Confirm snow loads for Mackenzie, the high country and foothill properties when designing the roof structure.

05
Coastal hazards from Kaikōura to Timaru
What it does

Check coastal erosion, sea-flooding and salt exposure from Kaikōura to Timaru.

07Local knowledge

Local requirements to check

Review these local considerations when planning a project in Canterbury.

01
Your local council
Why it matters

Confirm the administering council’s services, hazard information and contribution requirements.

02
Covenants in the new subdivisions
Why it matters

Check title covenants in subdivisions such as Rolleston, Lincoln, Prebbleton, Pegasus and Rangiora before choosing a design.

03
Wastewater on the plains
Why it matters

Properties outside public wastewater areas need an assessment of treatment and disposal capacity for another dwelling.

04
The nor'wester
Why it matters

Confirm wind exposure on the plains, foothills and exposed rural properties when specifying the structure.

08Uses for a small home

Uses for a small home in Canterbury

Possible uses include rentals near Christchurch employment and education, family accommodation in Rolleston, Rangiora and Kaiapoi, and staff housing on rural properties. New-subdivision covenants can restrict additional homes. Review the title and expected occupants before choosing a design or relying on a rental estimate.

The Canterbury examples use weekly two-bedroom rents from about $520 in Timaru to $620 in Christchurch. The simple-site Fern 48 construction estimate starts around $133,000. Foundation category, services and site work can affect the actual price. Confirm current local rents and obtain a quote from your chosen builder.

09Project steps

Steps to plan your project

Review the title, planning requirements and services before construction. Your designer, builder and council can confirm what the project requires.

01
Review the property title
What happens

Check covenants and easements that could restrict a second home, its size, location or access.

02
Check planning requirements
What happens

Review council maps and relevant district and regional rules for natural hazards, infrastructure and other restrictions.

03
Confirm service connections
What happens

Identify the water, wastewater and stormwater connections and confirm capacity. Check any requirements for an on-site wastewater system.

04
Obtain a PIM
What happens

Apply for and receive a Project Information Memorandum before construction starts. It records the council information relevant to the property and proposed work.

05
Finalise the plans
What happens

Your designer confirms the design requirements for the property and prepares the required plans and documentation. The Schedule 1A exemption requires appropriately licensed professionals.

06
Complete the building notifications
What happens

Notify the council before construction and provide the required completion documents afterwards. Your designer and builder must supply the records and certificates required for their work.

10The councils
11Locations

Plans anywhere in Canterbury.

These towns each have their own page with the local rent, ground notes and indicative construction time. Plan sets include a licence for one build with your chosen licensed builder, from $4,900. Seventy supplies the plans; construction is arranged separately.

SEE THE DESIGNSESTIMATE BUILD COST
12Questions

Frequently asked questions

Does Seventy supply plans in Canterbury?+

Seventy supplies architectural plans for properties in Canterbury, including Christchurch, Rangiora, Rolleston, Timaru. The plans are adapted to your address and include a licence for one build. You appoint and pay your own licensed builder to quote for and carry out construction.

Will I need consent for a small home in Canterbury?+

A home up to 70 m² may qualify for the building consent exemption if all Schedule 1A conditions are met. Resource consent is a separate question. In Canterbury, check the national planning standards and relevant local requirements, including hazards, services and the property title.

What ground conditions should I check in Canterbury?+

Canterbury gravel sites can differ substantially from softer eastern Christchurch and estuary ground. Technical categories TC1, TC2 and TC3 help identify foundation considerations, but do not replace property-specific advice. TC3 generally requires detailed geotechnical assessment. Inland and foothill sites may also require snow and wind design.

Which local requirements need checking in Canterbury?+

Check the technical category and any ground-investigation requirements for the property. Confirm the administering council’s services, hazard information and contribution requirements. Your designer and council can confirm the requirements for the specific address and proposed use. A general regional guide cannot establish whether an individual property is suitable for the design.

How should I budget for a small home in Canterbury?+

The Canterbury examples use weekly two-bedroom rents from about $520 in Timaru to $620 in Christchurch. The simple-site Fern 48 construction estimate starts around $133,000. Foundation category, services and site work can affect the actual price. Confirm current local rents and obtain a quote from your chosen builder.

How long could construction take in Canterbury?+

The regional construction allowance is 9 to 12 weeks. This is indicative and does not include every project stage. Your chosen builder confirms the start date and programme after reviewing the plans, site work, services, access and delivery requirements. Include time for any required council processes.

13Sources

Official guidance

The links below explain the national rules and exemption conditions. Confirm local requirements with your council.

Checked against these sources in September 2026. Confirm the current requirements for your property before construction.