New Plymouth · granny flats and small homesSEE THE DESIGNS
NGĀMOTU · TARANAKI · NEW PLYMOUTH DISTRICT COUNCIL · UPDATED SEPTEMBER 2026

Granny flats in New Plymouth.

Seventy supplies house plans for properties in New Plymouth. New Plymouth properties can combine coastal exposure with suburban or rural ground conditions. A second home needs enough usable space and suitable access for construction. Wind, salt exposure and current coastal or flood-hazard information should inform the design and the builder’s quote. You arrange construction separately with a licensed builder.

$580/wk
Indicative two-bedroom rent in New PlymouthIndicative planning estimate. Check current local listings and Tenancy Services market-rent data; this figure is not a rental appraisal.
$133,000
Indicative build fromA Fern 48 on a simple New Plymouth site, with a licensed builder.
10–13 wks
Indicative construction time10 to 13 weeks on site is an indicative allowance. Confirm timing with your builder; site work, weather and availability can change it.
70 m²
Maximum floor area under the exemptionsSubject to all relevant exemption conditions.
Kōwhai 60 shown in a Taranaki setting. Illustrative.Taranaki regional guide →
01What the law now allows

Building consent and resource consent requirements

The building consent exemption and the national planning standard are separate. A project can proceed without either consent only when all the relevant requirements are met.

01
The building consent exemption
Instrument

Schedule 1A, under the Building Act 2004

What it removes

Building consent, if all Schedule 1A conditions are met

How it works

A new, detached, single-storey home up to 70 m² may be built without a building consent if every exemption condition is met. Licensed professionals, Building Code compliance, a Project Information Memorandum and council notifications are still required.

02
The national planning standard
Instrument

NES-DMRU, under the Resource Management Act 1991

What it removes

Resource consent, if all relevant requirements are met

How it works

The national planning standard can permit one detached minor dwelling without resource consent when its standards and other relevant requirements are met. Some district and regional rules remain, including those for hazards, infrastructure and earthworks.

Both took effect on 15 January 2026. They do not retrospectively approve existing dwellings.

02National standards

National planning standards

The NES-DMRU is the national planning standard for detached minor dwellings. These measurements apply when its requirements are met. A district plan can allow more generous measurements. Other relevant site restrictions still apply.

StandardResidential zoneRural zone
Maximum internal floor areaMeasured to the internal face of the external walls. An attached or internally accessed garage counts inside it.70 m²70 m²
Maximum area of the site covered by buildingsThe 50% standard overrides any district plan coverage standard below 50% in a residential zone.50%As required by the zone
Minimum distance from the main homeDistances are measured from the outside face of the wall cladding.2 m2 m
Minimum distance from the front boundary2 m10 m
Minimum distance from side and rear boundaries2 m5 m

The permitted activity rule: One detached minor residential unit per site. It applies in residential, rural, mixed use and Māori purpose zones, as defined in the National Planning Standards, or the equivalent zones where a council has not implemented them yet.

District plan restrictions removed by the NES-DMRU
  • Special character, design guides and visual amenity
  • Screening for rubbish and recycling storage
  • Wall and roof colour, reflectivity and external finishes
  • Minimum outdoor open space, privacy or sunlight access
  • Minimum window area
  • Parking
  • Minimum site size
Examples of requirements removed by the NES-DMRU
  • A design that satisfies a local character guide
  • A minimum private outdoor space around the unit
  • A sunlight or privacy assessment for the neighbours
  • An on-site car park
  • A minimum site area under the district plan
  • Neighbour notification for a permitted activity
03Property requirements

Other requirements to check

In New Plymouth, check the following local consideration: Check New Plymouth District Council hazard mapping, service connections and applicable planning requirements.

01
Natural hazards
Check council maps

Flooding, coastal hazards, fault lines and land stability can affect the building location, floor level and need for consent. Check the council information and obtain site advice where needed.

02
Water, wastewater and stormwater
Check the property requirements

Check connection requirements and capacity. Relevant regional plan rules still apply, including requirements for an on-site wastewater system.

03
Electricity lines and infrastructure
Check council maps

Buildings near electricity lines and other significant infrastructure must meet the relevant safe-distance and planning requirements.

04
Nearby activities and contaminated land
Check council maps

Rules can apply near airports, ports, industry and farming operations, or on contaminated land. They may affect where a home can be built and what design measures are needed.

05
Earthworks and subdivision
Check the property requirements

Earthworks may need resource consent even when the dwelling does not. Subdivision requirements are separate and remain in place.

06
Heritage and cultural sites
Check council maps

Relevant protections for heritage, cultural sites and outstanding natural features still apply.

07
Title restrictions and bylaws
Check your property title

Check covenants and easements on your property title. The national planning standard does not override private covenants, and more stringent council bylaws can still apply.

08
Council contributions
Check the property requirements

Development and financial contributions may be payable. Ask your council to confirm which charges apply to your project.

Check both sets of requirements
Planning permission does not confirm building consent exemption

A district plan may allow a larger home or a smaller boundary setback. That does not change the separate Schedule 1A requirements. For example, an 80 m² dwelling or a 1 m setback would not meet the 70 m² and 2 m conditions for this building consent exemption.

04Does your site qualify

Check the main eligibility conditions

Check these conditions with your designer and council. They are a starting point; all relevant exemption requirements must be met.

01
Detached home
What it means

The minor dwelling must be physically separate from the principal home. An attached extension is assessed under different requirements.

02
Principal home on the same site
What it means

The NES-DMRU planning standard requires a minor dwelling to be secondary to a principal home on the same site and in the same ownership. If both are proposed together, confirm the construction order and requirements with the council.

03
One minor dwelling per site
What it means

The NES-DMRU allows one detached minor dwelling per site. For a cross-lease, the site includes all the land under the cross-lease. A district plan may allow more, subject to its requirements.

04
New dwelling for Schedule 1A
What it means

The building consent exemption applies to new dwellings. A building conversion may meet the planning standard, but it is not covered by this building consent exemption.

05Building in New Plymouth

Ground and climate considerations

Volcanic soils, coastal sands and sloping sites need individual assessment. Confirm drainage and foundation requirements for the property. Exposed coastal sites and ridgelines need a site-specific wind assessment. Check New Plymouth District Council hazard mapping, service connections and applicable planning requirements. These requirements inform the adapted plans and the construction quote from your chosen builder.

01
Wind zone
Design requirements

Exposed coastal sites and ridgelines need a site-specific wind assessment.

02
Ground
Foundation requirements

Volcanic soils, coastal sands and sloping sites need individual assessment. Confirm drainage and foundation requirements for the property.

03
Land
Local conditions

New Plymouth properties can combine coastal exposure with suburban or rural ground conditions.

04
Construction time
Indicative construction time

10 to 13 weeks on site is an indicative allowance. Confirm timing with your builder; site work, weather and availability can change it.

05
Local planning requirements
Requirements in New Plymouth District Council

Check New Plymouth District Council hazard mapping, service connections and applicable planning requirements.

06Uses for a small home

Uses for a small home in New Plymouth

A small home may suit family accommodation, downsizing or long-term tenants. Proximity to work, healthcare and transport can influence its usefulness. Plan for separate outdoor space and practical access between the existing house and the new home.

07Designs
08Rental estimates

Rental income estimates for New Plymouth

This example uses a Kōwhai 60 construction estimate and the indicative rent for New Plymouth. It excludes land value, finance, rates, insurance, maintenance, management fees and tax. It is an illustration, not an income forecast.

$580/wk
Indicative two-bedroom rentIndicative planning estimate. Check current local listings and Tenancy Services market-rent data; this figure is not a rental appraisal.
$28,954
Annual rent at 96% occupancyTwo vacant weeks a year assumed.
14.5%
Gross yield on the buildAgainst $200,000, the low end of a Kōwhai 60 build.
6.9 yrs
Build cost divided by annual rentBefore expenses. This is not a net payback forecast.
ESTIMATE RENTAL YIELDESTIMATE BUILD COST
09Project steps

Steps to plan your project

Review the title, planning requirements and services before construction. Your designer, builder and council can confirm what the project requires.

01
Review the property title
What happens

Check covenants and easements that could restrict a second home, its size, location or access.

02
Check planning requirements
What happens

Review council maps and relevant district and regional rules for natural hazards, infrastructure and other restrictions.

03
Confirm service connections
What happens

Identify the water, wastewater and stormwater connections and confirm capacity. Check any requirements for an on-site wastewater system.

04
Obtain a PIM
What happens

Apply for and receive a Project Information Memorandum before construction starts. It records the council information relevant to the property and proposed work.

05
Finalise the plans
What happens

Your designer confirms the design requirements for the property and prepares the required plans and documentation. The Schedule 1A exemption requires appropriately licensed professionals.

06
Complete the building notifications
What happens

Notify the council before construction and provide the required completion documents afterwards. Your designer and builder must supply the records and certificates required for their work.

10Questions

Frequently asked questions

What rent could a two-bedroom home earn in New Plymouth?+

The $580 weekly figure on this page is an indicative planning estimate, not a rental appraisal or guaranteed income. Check current listings and ask a local property manager about the specific location, size and condition. Allow for vacancy, maintenance, insurance, rates and other costs.

Do I need council consent in New Plymouth?+

A home up to 70 m² may qualify for the building consent exemption only when all conditions are met. Resource consent has separate requirements. Check New Plymouth District Council hazard mapping, service connections and applicable planning requirements. For an exempt build, receive the council’s Project Information Memorandum before work starts and submit the required completion documents.

How does coastal exposure affect materials?+

Salt exposure can influence cladding, coatings and fixing specifications. The required details depend on the property’s location and exposure. They need to be confirmed in the plans and included in the builder’s quote.

Will wind affect construction?+

Wind affects structural requirements and may affect the builder’s programme, particularly lifting and roofing work. Ask your builder to allow for the site’s exposure when confirming a start date and construction timeframe.

How long could construction take in New Plymouth?+

The 10 to 13-week on-site allowance is an estimate. Your builder needs to confirm the programme from the completed plans, ground works, access, service connections, material lead times and availability. Plan preparation and any required council processes are separate from this construction period.

11Sources

Official guidance

Every national figure comes from the legislation or the government's own guidance. The New Plymouth rent is an indicative planning figure rather than a quote: verify it against Tenancy Services bond data before you rely on it.

Checked against these sources in September 2026. Confirm the current requirements for your property before construction.

Find a design for your property.

Explore architect-signed plan sets, customised for your section in New Plymouth.

SEE THE DESIGNS
CALL USSEE THE DESIGNS