COUNCIL GUIDE · TARANAKI · UPDATED AUGUST 2026

Granny flat rules in New Plymouth.

A small home in New Plymouth may suit family members or tenants working in energy, engineering, health and port operations. Properties range from established town sections to lifestyle blocks around Bell Block, Ōakura and Egmont Village. A 70 m² dwelling needs sufficient space and suitable access and services. High wind and coastal exposure are important local design considerations, together with any mapped hazards and the conditions required for exemption eligibility.

70 m²
Maximum floor area under the exemptionsSubject to all relevant exemption conditions.
2 m
Boundary setback, residentialOther relevant site restrictions may require more space.
50%
Site coverage, residentialApplies under the NES-DMRU; other site rules may still apply.
0
Neighbours to notifyWhen the project meets the permitted activity requirements.
District council · New Plymouth · New Plymouth District Plan
Kōwhai 60 shown in a Taranaki setting. Illustrative.Taranaki regional guide →
01What the law now allows

Building consent and resource consent requirements

The building consent exemption and the national planning standard are separate. A project can proceed without either consent only when all the relevant requirements are met.

01
The building consent exemption
Instrument

Schedule 1A, under the Building Act 2004

What it removes

Building consent, if all Schedule 1A conditions are met

How it works

A new, detached, single-storey home up to 70 m² may be built without a building consent if every exemption condition is met. Licensed professionals, Building Code compliance, a Project Information Memorandum and council notifications are still required.

02
The national planning standard
Instrument

NES-DMRU, under the Resource Management Act 1991

What it removes

Resource consent, if all relevant requirements are met

How it works

The national planning standard can permit one detached minor dwelling without resource consent when its standards and other relevant requirements are met. Some district and regional rules remain, including those for hazards, infrastructure and earthworks.

Both took effect on 15 January 2026. They do not retrospectively approve existing dwellings.

02National standards

National planning standards

The NES-DMRU is the national planning standard for detached minor dwellings. These measurements apply when its requirements are met. A district plan can allow more generous measurements. Other relevant site restrictions still apply.

StandardResidential zoneRural zone
Maximum internal floor areaMeasured to the internal face of the external walls. An attached or internally accessed garage counts inside it.70 m²70 m²
Maximum area of the site covered by buildingsThe 50% standard overrides any district plan coverage standard below 50% in a residential zone.50%As required by the zone
Minimum distance from the main homeDistances are measured from the outside face of the wall cladding.2 m2 m
Minimum distance from the front boundary2 m10 m
Minimum distance from side and rear boundaries2 m5 m

The permitted activity rule: One detached minor residential unit per site. It applies in residential, rural, mixed use and Māori purpose zones, as defined in the National Planning Standards, or the equivalent zones where a council has not implemented them yet.

District plan restrictions removed by the NES-DMRU
  • Special character, design guides and visual amenity
  • Screening for rubbish and recycling storage
  • Wall and roof colour, reflectivity and external finishes
  • Minimum outdoor open space, privacy or sunlight access
  • Minimum window area
  • Parking
  • Minimum site size
Examples of requirements removed by the NES-DMRU
  • A design that satisfies a local character guide
  • A minimum private outdoor space around the unit
  • A sunlight or privacy assessment for the neighbours
  • An on-site car park
  • A minimum site area under the district plan
  • Neighbour notification for a permitted activity
03What New Plymouth still checks

Other requirements for your property

Check current coastal hazard and flood information for shoreline properties. Wind can reach Extra High on exposed coasts and ridgelines, so the design needs the actual conditions for the address. Rural and lifestyle properties also need adequate water, wastewater disposal and service connections.

01
Natural hazards
Check council maps

Flooding, coastal hazards, fault lines and land stability can affect the building location, floor level and need for consent. Check the council information and obtain site advice where needed.

02
Water, wastewater and stormwater
Check the property requirements

Check connection requirements and capacity. Relevant regional plan rules still apply, including requirements for an on-site wastewater system.

03
Electricity lines and infrastructure
Check council maps

Buildings near electricity lines and other significant infrastructure must meet the relevant safe-distance and planning requirements.

04
Nearby activities and contaminated land
Check council maps

Rules can apply near airports, ports, industry and farming operations, or on contaminated land. They may affect where a home can be built and what design measures are needed.

05
Earthworks and subdivision
Check the property requirements

Earthworks may need resource consent even when the dwelling does not. Subdivision requirements are separate and remain in place.

06
Heritage and cultural sites
Check council maps

Relevant protections for heritage, cultural sites and outstanding natural features still apply.

07
Title restrictions and bylaws
Check your property title

Check covenants and easements on your property title. The national planning standard does not override private covenants, and more stringent council bylaws can still apply.

08
Council contributions
Check the property requirements

Development and financial contributions may be payable. Ask your council to confirm which charges apply to your project.

Check both sets of requirements
Planning permission does not confirm building consent exemption

A district plan may allow a larger home or a smaller boundary setback. That does not change the separate Schedule 1A requirements. For example, an 80 m² dwelling or a 1 m setback would not meet the 70 m² and 2 m conditions for this building consent exemption.

04Does your site qualify

Check the main eligibility conditions

Check these conditions with your designer and council. They are a starting point; all relevant exemption requirements must be met.

01
Detached home
What it means

The minor dwelling must be physically separate from the principal home. An attached extension is assessed under different requirements.

02
Principal home on the same site
What it means

The NES-DMRU planning standard requires a minor dwelling to be secondary to a principal home on the same site and in the same ownership. If both are proposed together, confirm the construction order and requirements with the council.

03
One minor dwelling per site
What it means

The NES-DMRU allows one detached minor dwelling per site. For a cross-lease, the site includes all the land under the cross-lease. A district plan may allow more, subject to its requirements.

04
New dwelling for Schedule 1A
What it means

The building consent exemption applies to new dwellings. A building conversion may meet the planning standard, but it is not covered by this building consent exemption.

05Building in New Plymouth

Ground, climate and construction

Volcanic soils, coastal dunes and other ground conditions require foundations based on the report. Salt and wind exposure affect materials and structural design. The indicative construction period is 10 to 13 weeks, with weather and access allowances confirmed by your chosen builder.

Local project information
Indicative two-bedroom rent in New Plymouth: $580 a week
Read the New Plymouth guide for ground conditions, rental estimates and indicative construction times. Check current rents against Tenancy Services market-rent information.
GRANNY FLATS IN NEW PLYMOUTH
06Project steps

Steps to plan your project

Review the title, planning requirements and services with your designer, builder and council before construction.

01
Review the property title
What happens

Check covenants and easements that could restrict a second home, its size, location or access.

02
Check planning requirements
What happens

Review council maps and relevant district and regional rules for natural hazards, infrastructure and other restrictions.

03
Confirm service connections
What happens

Identify the water, wastewater and stormwater connections and confirm capacity. Check any requirements for an on-site wastewater system.

04
Obtain a PIM
What happens

Apply for and receive a Project Information Memorandum before construction starts. It records the council information relevant to the property and proposed work.

05
Finalise the plans
What happens

Your designer confirms the design requirements for the property and prepares the required plans and documentation. The Schedule 1A exemption requires appropriately licensed professionals.

06
Complete the building notifications
What happens

Notify the council before construction and provide the required completion documents afterwards. Your designer and builder must supply the records and certificates required for their work.

07Questions

Frequently asked questions

How does the wind zone change a New Plymouth build?+

The wind conditions affect structural bracing, fixings and sometimes glazing. The plans need engineering appropriate to the address, including Extra High requirements where applicable. Exposed sites can also have more weather interruptions, which your chosen builder needs to allow for in the programme.

What does the council's coastal mapping mean for me?+

Coastal hazard and flood information may affect where a dwelling can sit or the floor level required. The relevance depends on the specific address. Use current mapping and any required investigations to establish the appropriate design and property requirements.

What rent could a two-bedroom home receive in New Plymouth?+

Around $580 a week is an indicative rent for a two-bedroom home. Potential tenants include energy-sector contractors, hospital staff and port workers. Actual rent and occupancy vary. Check current listings and include vacancy, furnishing costs where relevant, and other ongoing expenses.

What makes a New Plymouth property suitable for a small home?+

The property needs enough space, practical access and suitable services, along with compliance with its planning and title requirements. Town sections and lifestyle blocks have different constraints. Longer rural service connections and any coastal or wind requirements need to be included in the project budget.

08Sources

Official guidance

Use the official guidance below and confirm current district requirements with your council before construction.

Checked against these sources in September 2026. Confirm the current requirements for your property before construction.

09In the region

More information for Taranaki

Regional guidance and nearby council guides.

Ready to plan your project?

Tell us what you have in mind for your property in New Plymouth District Council.

DISCUSS YOUR PROJECT
CALL USSEE THE DESIGNS