Granny flats and small homes in Auckland.

Auckland Council administers the Auckland Unitary Plan from Wellsford to Franklin. A small home may provide rental accommodation, space for family or a downsizing option on an existing property. Rear sections and cross-lease titles can require careful access and title checks. Seventy supplies plans adapted to your address. You appoint a licensed builder, and both national exemption conditions and relevant local requirements must be checked.

1
Council and district planAuckland Council and the Unitary Plan, Wellsford to Franklin.
$750
Indicative two-bedroom rentIndicative weekly estimate. Check current local rents.
50%
Site coverage, residentialThe national standard. Any stricter Unitary Plan figure is overridden.
10 to 12 wks
Indicative construction timeYour chosen builder confirms the programme.
Kōwhai 60 shown in an Auckland setting
KŌWHAI 60 SHOWN IN AN AUCKLAND SETTING. ILLUSTRATIVE.
01What the law now allows

Building consent and resource consent requirements

Both national reforms apply in Auckland. Building consent and resource consent are separate requirements. Your project must meet all the relevant conditions to proceed without either.

01
The building consent exemption
Instrument

Schedule 1A, under the Building Act 2004

What it removes

Building consent, if all Schedule 1A conditions are met

How it works

A new, detached, single-storey home up to 70 m² may be built without a building consent if every exemption condition is met. Licensed professionals, Building Code compliance, a Project Information Memorandum and council notifications are still required.

02
The national planning standard
Instrument

NES-DMRU, under the Resource Management Act 1991

What it removes

Resource consent, if all relevant requirements are met

How it works

The national planning standard can permit one detached minor dwelling without resource consent when its standards and other relevant requirements are met. Some district and regional rules remain, including those for hazards, infrastructure and earthworks.

Both took effect on 15 January 2026. They do not retrospectively approve existing dwellings.

02National standards

National planning standards

The NES-DMRU sets these measurements for qualifying detached minor dwellings in Auckland. District plans can allow more generous measurements. Other relevant site restrictions still apply.

StandardResidential zoneRural zone
Maximum internal floor areaMeasured to the internal face of the external walls. An attached or internally accessed garage counts inside it.70 m²70 m²
Maximum area of the site covered by buildingsThe 50% standard overrides any district plan coverage standard below 50% in a residential zone.50%As required by the zone
Minimum distance from the main homeDistances are measured from the outside face of the wall cladding.2 m2 m
Minimum distance from the front boundary2 m10 m
Minimum distance from side and rear boundaries2 m5 m

The permitted activity rule: One detached minor residential unit per site. It applies in residential, rural, mixed use and Māori purpose zones, as defined in the National Planning Standards, or the equivalent zones where a council has not implemented them yet.

District plan restrictions removed by the NES-DMRU
  • Special character, design guides and visual amenity
  • Screening for rubbish and recycling storage
  • Wall and roof colour, reflectivity and external finishes
  • Minimum outdoor open space, privacy or sunlight access
  • Minimum window area
  • Parking
  • Minimum site size
Examples of requirements removed by the NES-DMRU
  • A design that satisfies a local character guide
  • A minimum private outdoor space around the unit
  • A sunlight or privacy assessment for the neighbours
  • An on-site car park
  • A minimum site area under the district plan
  • Neighbour notification for a permitted activity
03Property requirements

Other requirements to check

Natural hazards, services, title restrictions and other site requirements can affect your project. Confirm which apply to your address.

01
Natural hazards
Check council maps

Flooding, coastal hazards, fault lines and land stability can affect the building location, floor level and need for consent. Check the council information and obtain site advice where needed.

02
Water, wastewater and stormwater
Check the property requirements

Check connection requirements and capacity. Relevant regional plan rules still apply, including requirements for an on-site wastewater system.

03
Electricity lines and infrastructure
Check council maps

Buildings near electricity lines and other significant infrastructure must meet the relevant safe-distance and planning requirements.

04
Nearby activities and contaminated land
Check council maps

Rules can apply near airports, ports, industry and farming operations, or on contaminated land. They may affect where a home can be built and what design measures are needed.

05
Earthworks and subdivision
Check the property requirements

Earthworks may need resource consent even when the dwelling does not. Subdivision requirements are separate and remain in place.

06
Heritage and cultural sites
Check council maps

Relevant protections for heritage, cultural sites and outstanding natural features still apply.

07
Title restrictions and bylaws
Check your property title

Check covenants and easements on your property title. The national planning standard does not override private covenants, and more stringent council bylaws can still apply.

08
Council contributions
Check the property requirements

Development and financial contributions may be payable. Ask your council to confirm which charges apply to your project.

Check both sets of requirements
Planning permission does not confirm building consent exemption

A district plan may allow a larger home or a smaller boundary setback. That does not change the separate Schedule 1A requirements. For example, an 80 m² dwelling or a 1 m setback would not meet the 70 m² and 2 m conditions for this building consent exemption.

04Does your site qualify

Check the main eligibility conditions

Check these conditions with your designer and council. They are a starting point; all relevant exemption requirements must be met.

01
Detached home
What it means

The minor dwelling must be physically separate from the principal home. An attached extension is assessed under different requirements.

02
Principal home on the same site
What it means

The NES-DMRU planning standard requires a minor dwelling to be secondary to a principal home on the same site and in the same ownership. If both are proposed together, confirm the construction order and requirements with the council.

03
One minor dwelling per site
What it means

The NES-DMRU allows one detached minor dwelling per site. For a cross-lease, the site includes all the land under the cross-lease. A district plan may allow more, subject to its requirements.

04
New dwelling for Schedule 1A
What it means

The building consent exemption applies to new dwellings. A building conversion may meet the planning standard, but it is not covered by this building consent exemption.

05Building in Auckland

Ground conditions and foundations

Clay soils can require foundations designed for moisture movement. Volcanic ground also needs a property-specific assessment. On a rear section, allow for vehicle access, concrete delivery and material storage. A three-metre driveway may still have restrictions that need checking with the builder.

Auckland properties include clay soils, volcanic ground, coastal land and steep sections. Wind exposure varies with elevation and shelter. On rear sites, driveway width, delivery access, drainage and space for materials can affect the construction method, price and schedule.

10 to 12 weeks
Indicative construction timeIndicative only. Your builder confirms the construction schedule.
06Natural hazards and mapped restrictions

Site restrictions in Auckland

Council maps help identify potential restrictions. Your designer and council can confirm how they affect the building location, floor level or need for additional reports.

01
Overland flow paths
What it does

Check whether an overland flow path crosses the property and how it affects the building location and drainage.

02
Flood plains and coastal inundation
What it does

Check the current flood and coastal-inundation information for low-lying land and harbour-edge sites.

03
Contaminated land
What it does

Former orchard and industrial land may need contamination assessment. Relevant soil-disturbance and land-use requirements still apply.

04
Volcanic viewshafts and heritage
What it does

Check whether any heritage protections or volcanic-viewshaft rules apply to the proposal.

05
The National Grid
What it does

Confirm the required distances from transmission lines and other electricity infrastructure before choosing a building location.

07Local knowledge

Local requirements to check

Review these local considerations when planning a project in Auckland.

01
Cross-lease titles
Why it matters

Review the cross-lease, flats plan and access rights. Shared-owner approvals may be needed, and the whole cross-lease generally counts as one site.

02
Hard surfaces and stormwater
Why it matters

Hard surfaces affect stormwater. Confirm drainage and connection requirements even when the national building-coverage standard is met.

03
Access width and staging
Why it matters

Check driveway width, overhead clearance, material storage and equipment access with the builder.

04
Development contributions
Why it matters

Ask Auckland Council which development or financial contributions apply and include them in the budget.

08Uses for a small home

Uses for a small home in Auckland

Auckland owners may use a small home for a parent, an adult child or tenants. Some may move into the smaller home and rent the main house. Nearby transport, hospitals and other employment can be relevant when researching rental demand, but income depends on the property and current market.

The Auckland example uses about $750 a week for a two-bedroom rental and construction from around $166,000 for a Kōwhai 60 on a simple site. Neither is a quote. Access, foundations, service connections and council contributions can change the budget. Check current rental listings and local market-rent data.

09Project steps

Steps to plan your project

Review the title, planning requirements and services before construction. Your designer, builder and council can confirm what the project requires.

01
Review the property title
What happens

Check covenants and easements that could restrict a second home, its size, location or access.

02
Check planning requirements
What happens

Review council maps and relevant district and regional rules for natural hazards, infrastructure and other restrictions.

03
Confirm service connections
What happens

Identify the water, wastewater and stormwater connections and confirm capacity. Check any requirements for an on-site wastewater system.

04
Obtain a PIM
What happens

Apply for and receive a Project Information Memorandum before construction starts. It records the council information relevant to the property and proposed work.

05
Finalise the plans
What happens

Your designer confirms the design requirements for the property and prepares the required plans and documentation. The Schedule 1A exemption requires appropriately licensed professionals.

06
Complete the building notifications
What happens

Notify the council before construction and provide the required completion documents afterwards. Your designer and builder must supply the records and certificates required for their work.

10The council

The council in Auckland.

Find your council guide for local natural-hazard information, services, contributions and the Project Information Memorandum process.

11Locations

Plans anywhere in Auckland.

These towns each have their own page with the local rent, ground notes and indicative construction time. Plan sets include a licence for one build with your chosen licensed builder, from $4,900. Seventy supplies the plans; construction is arranged separately.

SEE THE DESIGNSESTIMATE BUILD COST
12Questions

Frequently asked questions

Does Seventy supply plans in Auckland?+

Seventy supplies architectural plans for properties in Auckland, including Auckland. The plans are adapted to your address and include a licence for one build. You appoint and pay your own licensed builder to quote for and carry out construction. Discuss these requirements with your designer and chosen licensed builder before construction begins.

Will I need consent for a small home in Auckland?+

A home up to 70 m² may qualify for the building consent exemption if all Schedule 1A conditions are met. Resource consent is a separate question. In Auckland, check the national planning standards and relevant local requirements, including hazards, services and the property title.

What ground conditions should I check in Auckland?+

Clay soils can require foundations designed for moisture movement. Volcanic ground also needs a property-specific assessment. On a rear section, allow for vehicle access, concrete delivery and material storage. A three-metre driveway may still have restrictions that need checking with the builder.

Which local requirements need checking in Auckland?+

Check whether an overland flow path crosses the property and how it affects the building location and drainage. Review the cross-lease, flats plan and access rights. Shared-owner approvals may be needed, and the whole cross-lease generally counts as one site. Your designer and council can confirm the requirements for the specific address and proposed use. A general regional guide cannot establish whether an individual property is suitable for the design.

How should I budget for a small home in Auckland?+

The Auckland example uses about $750 a week for a two-bedroom rental and construction from around $166,000 for a Kōwhai 60 on a simple site. Neither is a quote. Access, foundations, service connections and council contributions can change the budget. Check current rental listings and local market-rent data.

How long could construction take in Auckland?+

The regional construction allowance is 10 to 12 weeks. This is indicative and does not include every project stage. Your chosen builder confirms the start date and programme after reviewing the plans, site work, services, access and delivery requirements. Include time for any required council processes.

13Sources

Official guidance

The links below explain the national rules and exemption conditions. Confirm local requirements with your council.

Checked against these sources in September 2026. Confirm the current requirements for your property before construction.