Granny flat rules in Masterton.
A small home in Masterton may provide accommodation for family members, local health and services workers, or Wellington commuters. Established sections may have space, but the design still needs suitable access, services and ground information. The Wairarapa Combined District Plan covers Masterton, Carterton and South Wairarapa. Low-lying properties near the Waipoua and Ruamahanga rivers need flood information, while newer subdivisions may have covenants affecting additional dwellings.
Building consent and resource consent requirements
The building consent exemption and the national planning standard are separate. A project can proceed without either consent only when all the relevant requirements are met.
Schedule 1A, under the Building Act 2004
Building consent, if all Schedule 1A conditions are met
A new, detached, single-storey home up to 70 m² may be built without a building consent if every exemption condition is met. Licensed professionals, Building Code compliance, a Project Information Memorandum and council notifications are still required.
NES-DMRU, under the Resource Management Act 1991
Resource consent, if all relevant requirements are met
The national planning standard can permit one detached minor dwelling without resource consent when its standards and other relevant requirements are met. Some district and regional rules remain, including those for hazards, infrastructure and earthworks.
Both took effect on 15 January 2026. They do not retrospectively approve existing dwellings.
National planning standards
The NES-DMRU is the national planning standard for detached minor dwellings. These measurements apply when its requirements are met. A district plan can allow more generous measurements. Other relevant site restrictions still apply.
| Standard | Residential zone | Rural zone |
|---|---|---|
| Maximum internal floor areaMeasured to the internal face of the external walls. An attached or internally accessed garage counts inside it. | 70 m² | 70 m² |
| Maximum area of the site covered by buildingsThe 50% standard overrides any district plan coverage standard below 50% in a residential zone. | 50% | As required by the zone |
| Minimum distance from the main homeDistances are measured from the outside face of the wall cladding. | 2 m | 2 m |
| Minimum distance from the front boundary | 2 m | 10 m |
| Minimum distance from side and rear boundaries | 2 m | 5 m |
The permitted activity rule: One detached minor residential unit per site. It applies in residential, rural, mixed use and Māori purpose zones, as defined in the National Planning Standards, or the equivalent zones where a council has not implemented them yet.
- Special character, design guides and visual amenity
- Screening for rubbish and recycling storage
- Wall and roof colour, reflectivity and external finishes
- Minimum outdoor open space, privacy or sunlight access
- Minimum window area
- Parking
- Minimum site size
- A design that satisfies a local character guide
- A minimum private outdoor space around the unit
- A sunlight or privacy assessment for the neighbours
- An on-site car park
- A minimum site area under the district plan
- Neighbour notification for a permitted activity
Other requirements for your property
Use the Wairarapa Combined District Plan to establish applicable requirements for the property. Check flood information near the Waipoua and Ruamahanga rivers and any title covenants in newer subdivisions. Rural projects also need adequate water, wastewater disposal, service connections and construction access.
Flooding, coastal hazards, fault lines and land stability can affect the building location, floor level and need for consent. Check the council information and obtain site advice where needed.
Check connection requirements and capacity. Relevant regional plan rules still apply, including requirements for an on-site wastewater system.
Buildings near electricity lines and other significant infrastructure must meet the relevant safe-distance and planning requirements.
Rules can apply near airports, ports, industry and farming operations, or on contaminated land. They may affect where a home can be built and what design measures are needed.
Earthworks may need resource consent even when the dwelling does not. Subdivision requirements are separate and remain in place.
Relevant protections for heritage, cultural sites and outstanding natural features still apply.
Check covenants and easements on your property title. The national planning standard does not override private covenants, and more stringent council bylaws can still apply.
Development and financial contributions may be payable. Ask your council to confirm which charges apply to your project.
A district plan may allow a larger home or a smaller boundary setback. That does not change the separate Schedule 1A requirements. For example, an 80 m² dwelling or a 1 m setback would not meet the 70 m² and 2 m conditions for this building consent exemption.
Check the main eligibility conditions
Check these conditions with your designer and council. They are a starting point; all relevant exemption requirements must be met.
The minor dwelling must be physically separate from the principal home. An attached extension is assessed under different requirements.
The NES-DMRU planning standard requires a minor dwelling to be secondary to a principal home on the same site and in the same ownership. If both are proposed together, confirm the construction order and requirements with the council.
The NES-DMRU allows one detached minor dwelling per site. For a cross-lease, the site includes all the land under the cross-lease. A district plan may allow more, subject to its requirements.
The building consent exemption applies to new dwellings. A building conversion may meet the planning standard, but it is not covered by this building consent exemption.
Ground, climate and construction
Terrace gravels and softer river-margin ground require foundations based on the report. The indicative construction period is 9 to 12 weeks, with access, services, ground work and weather reflected in the chosen builder's site-specific quote and construction programme.
Steps to plan your project
Review the title, planning requirements and services with your designer, builder and council before construction.
Check covenants and easements that could restrict a second home, its size, location or access.
Review council maps and relevant district and regional rules for natural hazards, infrastructure and other restrictions.
Identify the water, wastewater and stormwater connections and confirm capacity. Check any requirements for an on-site wastewater system.
Apply for and receive a Project Information Memorandum before construction starts. It records the council information relevant to the property and proposed work.
Your designer confirms the design requirements for the property and prepares the required plans and documentation. The Schedule 1A exemption requires appropriately licensed professionals.
Notify the council before construction and provide the required completion documents afterwards. Your designer and builder must supply the records and certificates required for their work.
Frequently asked questions
Does the combined Wairarapa plan change anything for Masterton?+
The Wairarapa Combined District Plan covers Masterton, Carterton and South Wairarapa, with each council administering its area. Requirements still depend on the property's zone and circumstances. The proposal also needs to address relevant hazards, services, title restrictions and exemption conditions.
Who might rent a small home in Masterton?+
Potential tenants include Wellington rail commuters, hospital staff and local workers. Suitability for commuters depends on their travel needs and the property's location. Check current rents and demand, and allow for vacancy and running costs when considering a rental project.
What should river-adjacent owners check?+
Check current flood information for land near the Waipoua and Ruamahanga rivers. It may affect floor levels, siting or suitability. Ground conditions and drainage also need attention, with the requirements for the actual address included in the proposed design.
What affects construction time and cost in Masterton?+
Ground conditions, services, access and the scope of site work determine cost and timing. The indicative construction period is 9 to 12 weeks. Your chosen builder should confirm a property-specific quote and programme, separately from plan preparation and any required investigations.
Official guidance
Use the official guidance below and confirm current district requirements with your council before construction.
- NES-DMRU: Frequently Asked QuestionsMinistry for Cities, Environment, Regions and Transport, September 2026 (INFO 1387)
- National Environmental Standards for Detached Minor Residential UnitsMinistry for the Environment
- Granny flats exemption guidance and resourcesBuilding Performance, MBIE
- Changes to allow granny flats to be built without a building consentBuilding Performance, MBIE
Checked against these sources in September 2026. Confirm the current requirements for your property before construction.
More information for Wellington · Wairarapa
Regional guidance and nearby council guides.