Granny flat rules in Buller.

A small home in Buller may suit family members or people working in mining, port operations, services and health. Flood conditions are a key consideration for properties in and around Westport, particularly following the 2021 floods. Reefton also has heritage requirements in some streets. The design needs to suit heavy rainfall, the site's ground conditions and any coastal exposure. Property suitability and the full construction cost need to be assessed before choosing a design.

70 m²
Maximum floor area under the exemptionsSubject to all relevant exemption conditions.
2 m
Boundary setback, residentialOther relevant site restrictions may require more space.
50%
Site coverage, residentialApplies under the NES-DMRU; other site rules may still apply.
0
Neighbours to notifyWhen the project meets the permitted activity requirements.
District council · Westport · Buller District Plan
Kōwhai 60 shown in a West Coast setting. Illustrative.West Coast regional guide →
01What the law now allows

Building consent and resource consent requirements

The building consent exemption and the national planning standard are separate. A project can proceed without either consent only when all the relevant requirements are met.

01
The building consent exemption
Instrument

Schedule 1A, under the Building Act 2004

What it removes

Building consent, if all Schedule 1A conditions are met

How it works

A new, detached, single-storey home up to 70 m² may be built without a building consent if every exemption condition is met. Licensed professionals, Building Code compliance, a Project Information Memorandum and council notifications are still required.

02
The national planning standard
Instrument

NES-DMRU, under the Resource Management Act 1991

What it removes

Resource consent, if all relevant requirements are met

How it works

The national planning standard can permit one detached minor dwelling without resource consent when its standards and other relevant requirements are met. Some district and regional rules remain, including those for hazards, infrastructure and earthworks.

Both took effect on 15 January 2026. They do not retrospectively approve existing dwellings.

02National standards

National planning standards

The NES-DMRU is the national planning standard for detached minor dwellings. These measurements apply when its requirements are met. A district plan can allow more generous measurements. Other relevant site restrictions still apply.

StandardResidential zoneRural zone
Maximum internal floor areaMeasured to the internal face of the external walls. An attached or internally accessed garage counts inside it.70 m²70 m²
Maximum area of the site covered by buildingsThe 50% standard overrides any district plan coverage standard below 50% in a residential zone.50%As required by the zone
Minimum distance from the main homeDistances are measured from the outside face of the wall cladding.2 m2 m
Minimum distance from the front boundary2 m10 m
Minimum distance from side and rear boundaries2 m5 m

The permitted activity rule: One detached minor residential unit per site. It applies in residential, rural, mixed use and Māori purpose zones, as defined in the National Planning Standards, or the equivalent zones where a council has not implemented them yet.

District plan restrictions removed by the NES-DMRU
  • Special character, design guides and visual amenity
  • Screening for rubbish and recycling storage
  • Wall and roof colour, reflectivity and external finishes
  • Minimum outdoor open space, privacy or sunlight access
  • Minimum window area
  • Parking
  • Minimum site size
Examples of requirements removed by the NES-DMRU
  • A design that satisfies a local character guide
  • A minimum private outdoor space around the unit
  • A sunlight or privacy assessment for the neighbours
  • An on-site car park
  • A minimum site area under the district plan
  • Neighbour notification for a permitted activity
03What Buller still checks

Other requirements for your property

Check current flood mapping around Westport and the Buller floodplain, including any relevant resilience or managed-retreat planning. These may affect whether and where a dwelling can be built. Coastal properties need erosion and salt-exposure information. Reefton properties may also have heritage or character requirements.

01
Natural hazards
Check council maps

Flooding, coastal hazards, fault lines and land stability can affect the building location, floor level and need for consent. Check the council information and obtain site advice where needed.

02
Water, wastewater and stormwater
Check the property requirements

Check connection requirements and capacity. Relevant regional plan rules still apply, including requirements for an on-site wastewater system.

03
Electricity lines and infrastructure
Check council maps

Buildings near electricity lines and other significant infrastructure must meet the relevant safe-distance and planning requirements.

04
Nearby activities and contaminated land
Check council maps

Rules can apply near airports, ports, industry and farming operations, or on contaminated land. They may affect where a home can be built and what design measures are needed.

05
Earthworks and subdivision
Check the property requirements

Earthworks may need resource consent even when the dwelling does not. Subdivision requirements are separate and remain in place.

06
Heritage and cultural sites
Check council maps

Relevant protections for heritage, cultural sites and outstanding natural features still apply.

07
Title restrictions and bylaws
Check your property title

Check covenants and easements on your property title. The national planning standard does not override private covenants, and more stringent council bylaws can still apply.

08
Council contributions
Check the property requirements

Development and financial contributions may be payable. Ask your council to confirm which charges apply to your project.

Check both sets of requirements
Planning permission does not confirm building consent exemption

A district plan may allow a larger home or a smaller boundary setback. That does not change the separate Schedule 1A requirements. For example, an 80 m² dwelling or a 1 m setback would not meet the 70 m² and 2 m conditions for this building consent exemption.

04Does your site qualify

Check the main eligibility conditions

Check these conditions with your designer and council. They are a starting point; all relevant exemption requirements must be met.

01
Detached home
What it means

The minor dwelling must be physically separate from the principal home. An attached extension is assessed under different requirements.

02
Principal home on the same site
What it means

The NES-DMRU planning standard requires a minor dwelling to be secondary to a principal home on the same site and in the same ownership. If both are proposed together, confirm the construction order and requirements with the council.

03
One minor dwelling per site
What it means

The NES-DMRU allows one detached minor dwelling per site. For a cross-lease, the site includes all the land under the cross-lease. A district plan may allow more, subject to its requirements.

04
New dwelling for Schedule 1A
What it means

The building consent exemption applies to new dwellings. A building conversion may meet the planning standard, but it is not covered by this building consent exemption.

05Building in Buller

Ground, climate and construction

Drainage, cladding and flashings need to suit rainfall that can reach two metres annually. Foundations depend on the ground report for river silts or coastal sands. The indicative construction period is 11 to 13 weeks, subject to freight, access and weather.

06Project steps

Steps to plan your project

Review the title, planning requirements and services with your designer, builder and council before construction.

01
Review the property title
What happens

Check covenants and easements that could restrict a second home, its size, location or access.

02
Check planning requirements
What happens

Review council maps and relevant district and regional rules for natural hazards, infrastructure and other restrictions.

03
Confirm service connections
What happens

Identify the water, wastewater and stormwater connections and confirm capacity. Check any requirements for an on-site wastewater system.

04
Obtain a PIM
What happens

Apply for and receive a Project Information Memorandum before construction starts. It records the council information relevant to the property and proposed work.

05
Finalise the plans
What happens

Your designer confirms the design requirements for the property and prepares the required plans and documentation. The Schedule 1A exemption requires appropriately licensed professionals.

06
Complete the building notifications
What happens

Notify the council before construction and provide the required completion documents afterwards. Your designer and builder must supply the records and certificates required for their work.

07Questions

Frequently asked questions

Can I build a small home in Westport after the floods?+

It depends on the specific property and current flood information. Some sites may accommodate a dwelling with appropriate floor levels or siting, while others may be unsuitable. Relevant flood, resilience and planning requirements need to be reflected in the design.

What should I consider for a small home in Reefton?+

An established section may have space for family or rental accommodation. Check access, services and ground conditions, as well as heritage or character requirements that may affect visibility and materials. Any rental estimate should use current local demand and allow for vacancy.

How does Coast rain change the build?+

High rainfall affects gutters, downpipes, ground drainage, cladding and flashings. Those elements need to be designed for the property's conditions and built as specified. Your builder also needs to allow for wet weather when arranging construction and deliveries.

Who might rent a small home in Buller?+

Potential tenants include mining, port, services and health workers. Demand differs between Westport, Reefton and smaller communities. Check current rents and available housing for the location, and include vacancy and ongoing costs when estimating the return from a rental home.

08Sources

Official guidance

Use the official guidance below and confirm current district requirements with your council before construction.

Checked against these sources in September 2026. Confirm the current requirements for your property before construction.

09In the region

More information for West Coast

Regional guidance and nearby council guides.

Ready to plan your project?

Tell us what you have in mind for your property in Buller District Council.

DISCUSS YOUR PROJECT
CALL USSEE THE DESIGNS