Current project
Saved locally
100%
A–201 / NORTH ELEVATION 1:50 @ A3
N
Customised front elevation A live architectural elevation that changes as materials are selected.
Specification pack

Ready for review.

Material Studio
Material selection schedule

Ridgeview House

Kōwhai 60 · Option 04 · 11 July 2026

Client review6 / 6 selected
Project brief
Region
Waikato
Exposure
High wind
Budget
Balanced
Plan
Kōwhai 60

Selections are indicative until availability, substrate, fixing method, site exposure and Building Code requirements are confirmed by the project team.

01

Selected materials

6 items
ElementSelectionSupplierFinish / noteStatus
02

Client requirements

03

Next checks

  • Confirm physical samples in natural light.
  • Confirm lead times and regional availability.
  • Engineer to review wind-zone fixing requirements.
  • Designer to issue consent-set references.