Current project
Saved locally
100%
A–201 / NORTH ELEVATION 1:50 @ A3
N
Customised front elevation A front view that updates when you select materials.
Material list

Review your material list.

Material Studio
Selected materials

Ridgeview House

Kōwhai 60 · Option 04 · 11 July 2026

Selection review6 / 6 selected
Project brief
Region
Waikato
Wind exposure
High wind
Coastal exposure
More than 1 km from breaking surf
Budget
Balanced
Plan
Kōwhai 60

Selections are provisional. Your designer and builder must confirm product availability, supporting construction, fixings, site exposure and Building Code requirements.

01

Selected materials

6 items
ElementSelectionSupplierFinish / noteStatus
02

Project requirements

03

Before ordering materials

  • Confirm physical samples in natural light.
  • Confirm lead times and regional availability.
  • Ask the engineer to confirm fixings for the wind conditions.
  • Ask the designer to confirm the relevant construction drawings.